Government decisions:

  1. Government Decision No. 743 of 6 November 2024 on quality assurance in construction
  2. Government Decision No. 369 of 29 May 2024 approving the regulation on the technical investigation of the causes of accidents and incidents in the field of industrial safety
  3. Government Decision No. 207 of 3 April 2019 approving the regulation on emergency situations in the natural gas market and the action plan for emergency situations in the natural gas market
  4. Government Decision No. 1104 of 14 November 2018 approving the regulation on protection zones of natural gas networks
  5. Government Decision No. 373 of 24 April 2018 on the national pollutant release and transfer register
  6. Government Decision No. 360 of 25 June 1996 on state quality control in construction

ANRE Decisions:

  1. ANRE Decision No. 337 of 26 May 2026 approving the regulated entry/exit tariffs for the natural gas transmission service provided by Vestmoldtransgaz LLC
  2. ANRE Decision No. 336 of 26 May 2026 approving the multipliers applied by Vestmoldtransgaz LLC to quarterly, monthly, daily and/or within-day standard capacity products for the 2026–2027 gas year
  3. ANRE Decision No. 310 of 6 May 2026 amending the natural gas network code approved by ANRE Administrative Board Decision No. 420/2019
  4. ANRE Decision No. 820 of 23 December 2025 amending the terms and conditions for the provision of the linepack flexibility service by the natural gas transmission system operator approved by ANRE Decision No. 701/2024
  5. ANRE Decision No. 756 of 9 December 2025 approving the report on the implementation of interim balancing measures
  6. ANRE Decision No. 330 of 20 June 2025 amending ANRE Decision No. 624/2023 approving the list of entry/exit points, the list of entry/exit point groups and the list of relevant points of the natural gas transmission network operated by Vestmoldtransgaz LLC
  7. ANRE Decision No. 272 of 28 May 2025 approving the proposal of Vestmoldtransgaz LLC to offer the monthly capacity product “Route 1” at the interconnection points located on the Trans-Balkan natural gas transmission pipeline between the transmission systems of Greece, Bulgaria, Romania, the Republic of Moldova and Ukraine
  8. ANRE Decision No. 617 of 24 October 2025 amending ANRE Decision No. 272/2025 of 28 May 2025
  9. ANRE Decision No. 712 of 21 November 2025 amending ANRE Decision No. 272/2025 of 28 May 2025
  10. ANRE Decision No. 260 of 16 April 2026 amending ANRE Decision No. 272/2025 of 28 May 2025
  11. ANRE Decision No. 271 of 27 May 2025 approving the regulated entry/exit tariffs for the natural gas transmission service provided by Vestmoldtransgaz LLC
  12. ANRE Decision No. 270 of 27 May 2025 approving the multipliers applied by Vestmoldtransgaz LLC to quarterly, monthly, daily and/or within-day standard capacity products for the 2025–2026 gas year
  13. ANRE Decision No. 233 of 13 May 2025 approving the rights and obligations of the independent system operator Vestmoldtransgaz LLC and the owners of natural gas transmission networks
  14. ANRE Decision No. 14 of 14 January 2025 approving the investment plan of Vestmoldtransgaz LLC for 2025
  15. ANRE Decision No. 746 of 19 December 2024 amending Annex No. 1 to ANRE Decision No. 624/2023 approving the list of entry/exit points, the list of entry/exit point groups and the list of relevant points of the natural gas transmission network operated by Vestmoldtransgaz LLC
  16. ANRE Decision No. 701 of 12 December 2024 approving the terms and conditions for the provision of the linepack flexibility service by the natural gas transmission system operator
  17. ANRE Decision No. 727 of 12 December 2024 amending the investment plan of Vestmoldtransgaz LLC for 2024
  18. ANRE Decision No. 565 of 27 September 2024 approving the methodology for calculating neutrality charges
  19. ANRE Decision No. 524 of 3 September 2024 approving the multipliers applied by Vestmoldtransgaz LLC to quarterly, monthly, daily and/or within-day standard capacity products for 2024
  20. ANRE Decision No. 516 of 23 August 2024 approving the report on the implementation of interim balancing measures
  21. ANRE Decision No. 517 of 23 August 2024 approving the regulated entry/exit tariffs for the natural gas transmission service provided by Vestmoldtransgaz LLC
  22. ANRE Decision No. 513 of 23 August 2024 certifying Vestmoldtransgaz LLC as the natural gas transmission system operator
  23. ANRE Decision No. 286 of 30 April 2024 approving the incremental capacity project proposal at the interconnection points between the natural gas transmission systems of the Republic of Moldova and Ukraine
  24. ANRE Decision No. 130 of 1 March 2024 approving the compliance officer of Vestmoldtransgaz LLC
  25. ANRE Decision No. 73 of 16 February 2024 approving the compliance programme of Vestmoldtransgaz LLC
  26. ANRE Decision No. 79 of 16 February 2024 on the provisional certification of Vestmoldtransgaz LLC as the natural gas transmission system operator
  27. ANRE Decision No. 820 of 22 December 2023 approving the development plan of Vestmoldtransgaz LLC for 2023–2032
  28. ANRE Decision No. 625 of 27 October 2023 approving the regulated entry/exit tariffs for the natural gas transmission service provided by Vestmoldtransgaz LLC
  29. ANRE Decision No. 624 of 27 October 2023 approving the list of entry/exit points, the list of entry/exit point groups and the list of relevant points of the natural gas transmission network operated by Vestmoldtransgaz LLC
  30. ANRE Decision No. 560 of 15 September 2023 on ensuring the continuity of operation of the natural gas transmission system of the Republic of Moldova
  31. ANRE Decision No. 561 of 15 September 2023 on ensuring the balancing of the natural gas transmission system of the Republic of Moldova
  32. ANRE Decision No. 434 of 7 July 2023 on the provisional designation of Vestmoldtransgaz LLC as the natural gas transmission system operator (TSO) of the Republic of Moldova
  33. ANRE Decision No. 964 of 23 December 2022 approving the development plan of Vestmoldtransgaz LLC for 2022–2031
  34. ANRE Decision No. 415 of 21 September 2021 approving the list of entry/exit points and the list of entry/exit point groups of the natural gas transmission network owned by Vestmoldtransgaz LLC
  35. ANRE Decision No. 223/2021 approving the list of relevant points
  36. ANRE Decision No. 507/2020 approving the list of entry/exit points
  37. ANRE Decision No. 420 of 22 November 2019 approving the natural gas network code
  38. ANRE Decision No. 421 of 22 November 2019 approving the regulation on access to natural gas transmission networks and congestion management
  39. ANRE Decision No. 112 of 19 April 2019 approving the regulation on connection to natural gas networks and the provision of natural gas transmission and distribution services
  40. ANRE Decision No. 422 of 22 November 2019 approving the regulation on the quality of natural gas transmission and distribution services
  41. ANRE Decision No. 297 of 3 June 2022 approving the regulation on natural gas measurement for commercial purposes
  42. ANRE Decision No. 535 of 27 December 2019 approving the methodology for the calculation, approval and application of regulated tariffs for natural gas transmission services
  43. ANRE Decision No. 283 of 15 November 2016 approving the regulation on the planning, approval and implementation of investments
  44. ANRE Decision No. 534 of 27 December 2019 approving the natural gas market rules
  45. ANRE Decision No. 482 of 13 December 2017 approving the regulation on monitoring compliance programmes
  46. ANRE Decision No. 470 of 30 November 2017 approving the list of relevant points of the natural gas transmission network of Vestmoldtransgaz State Enterprise (SE)