AVAILABLE TECHNICAL CAPACITIES 2026

AVAILABLE TECHNICAL CAPACITIES 2025

AVAILABLE TECHNICAL CAPACITIES 2024 

 

July 2026

 INTERCONNECTION POINT   AVAILABLE CAPACITY
kWh/day
ENTRY EXIT
 Grebenyky  380 089 800 121 416 575
 Oleksiivka  51 734 445  1 055 805
 Kaushany  121 416 575  380 089 800
 Ananiev  0  0
 Ungheni  46 918 928  21 599 831
 Limanskoe 0  0
Exit to distribution network 0 489 582 000
Consumers whose usage facilities
are connected to the natural gas transmission network
0 8 828 000